Add new comment

Andrew Thomson's picture
Dec 31, 2020 - 12:47

There should be no case where nuclear plant refurbishment or new SME plants should be considered without a full cost accounting of the related DWR (Deep Waste Repositories) required for the indefinite storage of both current and existing spent fuels and contaminated materials. One need only look to the deep waste repositories in Germany for an example of what is required (in 1.4km deep, geologically stable basaltic). Placing surface storage in an active seismic zone on the headwaters of the principal drinking water reserves of major cities and even smaller municipalities is incredibly short-sighted. As an architect deeply involved in the technical adjudication of large commercial buildings, we can deliver projects with upwards of 75% reductions in total energy use. We do not need to continually refer to the necessity of powering a low-carbon future with nuclear - as conservation and DSM csot as little as 1/10th the cost of new generation capacity - even without factoring in waste storage facilities. WWS (Wind Water and Solar) combined with massive reductions on demand-side should have an absolute priority over costly nuclear solutions - the problem is the entrenched nuclear lobby and knowingly corrupt players (SNC to name but one). Get out of the game of hot garbage grift Canada - take a lead on the issue and find a way out of this mess. From a citizen with a property and business on the Ottawa River.

  • Like this comment 0
  • Dislike this comment 1